• <ol id="tik7n"><dfn id="tik7n"></dfn></ol>
    <source id="tik7n"></source>

  • <source id="tik7n"><dfn id="tik7n"></dfn></source>
    <source id="tik7n"></source>
    1. <i id="tik7n"><div id="tik7n"><acronym id="tik7n"></acronym></div></i>
        <video id="tik7n"></video>
      <tt id="tik7n"><small id="tik7n"><b id="tik7n"></b></small></tt>
        保洁船

        Product

        Contact Us

        Zhangjiagang Lihe Marine Machinery Manufacturing Co., Ltd.

         Contact person: Mr. Lu

         Telephone:0512-58652848

         Mobile phone:13906248260

         Service hotline : 0512-58119849

         Fax:0512-58119848

         Mailbox : zjglizhou@sina.com

         Zip code : 215622

         Address: Jiangsu province Zhangjiagang Leyu town red road 41 west of mega Le farm


        FRP vessel

        Your current location: Home >> Products >> FRP vessel

        FRP vessel

        • Belong:FRP vessel

        • Clicks:
        • Date:2017/06/05
        • Inquiry
        Detailed

        DSC01958_副本.jpg


        1.jpg

        First, in the ship site commissioning training, the use of personnel and maintenance personnel must participate. During the commissioning and commissioning of the cleaning ship, the technical personnel of the company will adjust and test each part of the collection system until stable operation is achieved. The use of personnel in observation, debugging, should pay attention to training personnel debugging procedures and processes, numerical settings, in the later use of the process, such as the same problems, should be correct operation callback measures, to resume normal use. Daily inspection includes hydraulic oil and diesel oil line joint tightness check, observe whether there is leakage and loose.

        Two, the company technical staff in training will be on the ship electrical system, fire system is fully explained, in each part of the obvious signs, the use of personnel should be daily routine inspection.

        Three, the use and maintenance personnel in the daily work is completed, should be in time to ship deck and cabin flushing, to avoid the fine waste, long-term accumulation in a part, cause the corrosion of parts and components.

        Four, when the ship does not use for a long time, please start once a month, keep the power supply of the battery stable, and make sure the ship is in operation at any time. When the water temperature is below 0 degrees in winter, please lift the ship ashore for maintenance, and release the water from the engine, water pump and oil cooler to prevent frost cracking.



        Tag:FRPvessel,FRPvessel价格,FRPvessel批发

        Prev:None
        Next:FRP vessel

        Browsing:

        Products:

        News:

        分享
        利来w66app|首页